How long will it take to heat up? |
|
|
|
How long it takes to heat the floor will vary, depending on your sub-floor
& its insulation.
Generally the better the insulation the quicker
it will heat up, 30 minutes to an hour on a wooden floor, but it may take
several hours on just a concrete floor. However it
will also retain the heat in the concrete & therefore take much longer
to cool down.
Warm up times can be drastically reduced to as little as
15-20 minutes using a load bearing insulation board. Click here to find a wide selection of Insulation board.
|